Tuesday 29 November 2016

Update on the main extension



Opening made to join old sitting room to new extension more than doubling the size of the sitting room. The concrete floor has been excavated down to the clay subsoil. Two "I" beams can be seen which support the first floor wall above. The old fireplace and brick  flue will be taken out next.


Another view of the opening , showing where the front window was originally placed, this will now be a double door opening into the new conservatory.


A View from the door way into the old sitting room , showing the extent of the new combined room.


New doorway from what will be the conservatory leading into the new enlarged sitting room.


Concrete rubble taken out of the ol sitting room.

Thursday 10 November 2016

Rafters and Joists !


Rear View showing new rafters and Joists


Another View showing rafters and Joists



Rear View showing Roof of the Lean To

Wednesday 2 November 2016

More Progress on the Build


The Refurbished rear lean to is now up to its roof height.




Another view showing the window slots


View showing the new wing extension now up to first floor level, also showing position of the long window light.


Re furbished Lean to up to roof level.