Thursday 15 November 2012

Footings and Stanchions Pads are in.




This is a photo showing the footings and stanchion pads which will take the steel I beam stanchions, the superstructure of the building. This photograph shows the run for the north side of the lean to building. A total of 7 cement lorries delivered cement from 1.30 pm until 6.30 pm, the last 2 hours we had to make do with the headlights of the swing shovel digger to help with the positioning of the pads which were positioned with plumb lines. Its all in now , we have been lucky with the weather during this part of the operation.


A View showing the pads and footings for the underground basement for the art gallery, note the 45% grading back of the sides, this will mean there is no need for tanking as water will drain away using the natural gradient of the plot.

No comments:

Post a Comment