Monday 30 January 2017

Roof and Windows



Double glazed Windows are now being installed, roof trusses were delivered today and they are now being erected , fortunately no wind just light drizzle.





Another view showing roof truss erection.


Work on roof fro the South west also showing newly installed double glazed windows.



Thursday 5 January 2017

January 2017 Progress report for Tillicks Cottage Woodhayes Farm

A Lot has been achieved in just a few days of  January 2017,  the foundations and concrete base for the new conservatory has been put in place and the stud work for the first floor bedrooms and bathrooms has been installed.





New Base for the Conservatory


A View from the North East


A View from the East showing the Conservatory Base and progress on the left hand extension.



A View of the New Conservatory Base from the enlarged sitting Room.


Stud work showing the first floor corridor from the new extension past the enlarged bedroom and onto the master bedroom (blue paint).


Studwork of the main bathroom and ensuite to the master bedroom, view from the master bedroom





Tuesday 3 January 2017

Aerial View of Woodhayes in Winter

We would like to share this aerial footage of Woodhayes taken by Mike Evans   www.nextleveltech.co.uk  who was staying over the festive period at the Orchard Barn with his family, this is Mikes first attempt, so not bad at all, we will be looking at more footage of the farm in the summer months: