A Lot has been achieved in just a few days of January 2017, the foundations and concrete base for the new conservatory has been put in place and the stud work for the first floor bedrooms and bathrooms has been installed.
New Base for the Conservatory
A View from the North East
A View from the East showing the Conservatory Base and progress on the left hand extension.
A View of the New Conservatory Base from the enlarged sitting Room.
Stud work showing the first floor corridor from the new extension past the enlarged bedroom and onto the master bedroom (blue paint).
Studwork of the main bathroom and ensuite to the master bedroom, view from the master bedroom
No comments:
Post a Comment