Aerial View of Woodhayes in Winter
We would like to share this aerial footage of Woodhayes taken by Mike Evans www.nextleveltech.co.uk who was staying over the festive period at the Orchard Barn with his family, this is Mikes first attempt, so not bad at all, we will be looking at more footage of the farm in the summer months:
Tuesday, 20 December 2016
Progress on Tillicks Cottage December 2016
Tom starting the Blockwork for the first floor, rear view looking East.
Another View of the Progress Made on the Blockwork of the first floor showing the inner insulation blocks with the cavity wall gap of 100 mm and an inner 50mm Celetex insulation board nestled within the 100mm cavity.
A view showing the front of the cottage showing the progress of the Northerly wing. The view also shows the footings that have been dug in preparation for the concrete pour.
A View of the first floor joists in place in the new wing looking onto the old sitting room with the removed fireplace.
Ben finishing of first floor joists that are replacing the void left by the removal of the old staircase and block work wall.
Another view showing the new first floor floor replacing the void where the old staircase was located, the photo also shows the new concrete floor of what will be the enlarged Kitchen Dining area.
Friday, 2 December 2016
Removing Internal Walls
View of the Kitchen before wall has been removed.
Wall removed and concrete floor removed in what was the hallway.
Another view
Tuesday, 29 November 2016
Update on the main extension
Opening made to join old sitting room to new extension more than doubling the size of the sitting room. The concrete floor has been excavated down to the clay subsoil. Two "I" beams can be seen which support the first floor wall above. The old fireplace and brick flue will be taken out next.
Another view of the opening , showing where the front window was originally placed, this will now be a double door opening into the new conservatory.
A View from the door way into the old sitting room , showing the extent of the new combined room.
New doorway from what will be the conservatory leading into the new enlarged sitting room.
Concrete rubble taken out of the ol sitting room.
Thursday, 10 November 2016
Rafters and Joists !
Rear View showing new rafters and Joists
Another View showing rafters and Joists
Rear View showing Roof of the Lean To
Wednesday, 2 November 2016
More Progress on the Build
The Refurbished rear lean to is now up to its roof height.
Another view showing the window slots
View showing the new wing extension now up to first floor level, also showing position of the long window light.
Re furbished Lean to up to roof level.
Tuesday, 11 October 2016
Chippings, Plastic Liner and Oversite
This shot shows the recently set concrete aprox 8 inches thick, which forms the oversite , which is principally a layer of concrete used to seal the earth under the ground floor of a house. The Oversite concrete is poured on to a layer of plastic which sits onto a flat bed of levelled chippings.
This is another view showing the Oversite.
A View from the south.
We have also created a layer of the rubble from the demolished walls and placed them at the entrance of the cottage, this will form the base of the parking area which we will eventually dress with gravel, you can see we have put down some chippings over the rubble to create a flat and even surface.